Skip to main content
Skip to service level comparison
Back to Explore

What's the Difference?

Understanding Turnkey vs Shell vs Kit: Choose how much you want to do yourself versus having the manufacturer handle.

Kit / DIY

High Involvement

You receive pre-cut materials and plans, then handle construction yourself or with contractors you hire.

30-50% savings vs turnkey
6-18 months

What's Included

  • Pre-cut materials and components
  • Detailed building plans
  • Assembly instructions
  • Technical support (varies)

You Handle

  • Site preparation and foundation
  • All construction and assembly
  • Utility hookups (electric, water, sewer/septic)

Shell / Dried-In

Medium Involvement

The manufacturer delivers and installs the weathertight shell. You complete the interior finishing.

15-25% savings vs turnkey
3-8 months

What's Included

  • Delivery and crane services
  • Shell installation by company crew
  • Weathertight exterior complete
  • Basic structure ready

You Handle

  • Foundation (sometimes included)
  • Interior finishing work
  • Electrical, plumbing, HVAC

Turnkey

Minimal Involvement

Complete, move-in ready home. The manufacturer handles everything from foundation to final inspection.

Baseline price
3-7 months

What's Included

  • Site preparation and foundation
  • Complete home construction
  • All systems (electric, plumbing, HVAC)
  • Interior finishing and appliances

You Handle

  • Site access coordination
  • Decision-making on options
  • Final walkthrough approval

Who Is This For?

DIY Enthusiast

You have construction experience or are comfortable learning. You have time and want maximum savings.

Hands-onBudget-consciousFlexible timeline

Have a Contractor

You have a trusted contractor or can manage subs. You want some savings while avoiding the heavy lifting.

Some experienceGood local contactsBalanced approach

Busy Professional / Hands-Off

You want a hassle-free experience. Your time is valuable and you prefer professionals handle everything.

Time-constrainedConvenience-focusedPremium budget

Side-by-Side Comparison

FeatureKit / DIYShellTurnkey
Your Involvement
High
Medium
Minimal
Typical Savings
30-50%
15-25%
Baseline
Timeline
6-18 mo
3-8 mo
3-7 mo
Materials Included
Delivery Included
Varies
Installation
Shell only
Interior Finishing
Permits Handled
Varies

About these estimates

Savings percentages and timelines are based on industry data from December 2025. Actual costs vary by project complexity, location, and market conditions.

Construction timelines assume permits are obtained and site is prepared. Design and permitting phases may add 2-6 months.

For a detailed breakdown of all 5 service level variations, see our Building Guide.

Ready to see real numbers? Use our Budget Explorer to estimate total project costs including site work, delivery, and permits.

Ready to Explore Your Options?

Browse prefab models and filter by service level to find what fits your needs.

Browse Models
0 of 4 selectedAdd more