Permitting an ADU or home in Portland

ADU verdict · Portland

Building an ADU here

  • ADUs are allowed by right (administrative review only).
  • No owner-occupancy requirement.
  • No sprinkler requirement for 1–2 units.
  • No flat square-foot maximum; ADU gross floor area is capped at two-thirds (2/3) of the principal unit's gross floor area per Portland Land Use Code §6.6.2.A.9 (a ratio, not a fixed ceiling).
  • Short-term rentals: permitted.Short-term-rental rules vary by location here — Peaks Island: prohibited. Confirm the rule for your specific parcel.
Max ADU size
⅔ of main home
Building-permit review
4-6 wks
Permits to build
Building permit+ trade sub-permits
How you file
Online portal

The typical order

confirm with the code office

Which permits may apply — sequence is typical; some steps run in parallel.

New home: 19 permits may apply. Approvals: Typically no public hearing.

  1. ApprovalsTypically no public hearing
    • Minor Site Plan (Residential) Application
  2. Site & utilities
    • Street Opening Permit
    • Stormwater Quality Permit
    • Subsurface Wastewater Permit
    • Water Service
  3. Build
    • Building Permit
    • Electrical Permit
    • Plumbing Permit
    • HVAC Permit
    • Fuel Tank Permit
    • Site Inspection
    • Demolition Permit
    • Impact Fees (Recreation, Transportation, Wastewater)
    • Internal Plumbing Permit
  4. Final sign-off
    • Certificate of Occupancy
  5. Your land's triggers

    Depends on your lot

    The steps above are Portland's standard permit path — which ones apply depends on your project. What's below depends on where your lot sits, and the zoning map can't see it.

    Parcel diagnostics unscanned
    • Flood hazard
    • Wetland / vernal pool (NRPA)
    • Shoreland
    • Historic district
    • Site & soil conditions
    • Per-lot fee impact
    Launching soon

    This page names the questions; your parcel gives the answers — which fire, why, and cited. That's the paid lot report.

Showing 15 of 19 permits by name — the rest are lot-dependent or listed in the full permit ledger below.

Where to apply

Department
Permitting & Inspections
Address
389 Congress Street, Portland, Maine 04101

Intake details current as of April 10, 2026. Confirm with the code office before applying.

Permits you may need

  • Building PermitOnline portal· 4-6 wksApply
  • Electrical PermitOnline portal· 4-6 wksApply
  • Plumbing PermitOnline portal· 4-6 wksApply
  • HVAC PermitOnline portal· 4-6 wksApply
  • Fuel Tank PermitOnline portal· ~2-4 wksApply
  • Certificate of OccupancyOnline portalApply
  • Minor Site Plan (Residential) ApplicationOnline portal· 4-6 wksApply
  • Site InspectionOnline portalApply
  • Historic ReviewOnline portal· 2-4 wksApply
  • Flood Hazard Development PermitOnline portal· 2-4 wksApply
  • Street Opening PermitOnline portal· 1-2 wksApply
  • Stormwater Quality PermitOnline portal· 4-6 wksApply

Review times run longer in peak building season — confirm current turnaround with the code office.

This is public-record guidance, not legal advice — verify with the code office before applying. Maine fee schedules revise annually on July 1.

ADUs allowed by right (LD 2003). Portland permits up to 2 per lot (Portland Land Use Code · Adopted Dec 4, 2024). Search your address to check your lot.